Content marketing for architects
A free content brief for small architecture practices, built from real articles London practices wrote for homeowners about the planning wait. Start with your own application record, not the eight-week answer.
ArchitectsContent marketingBrief
Free brief · no sign-up
How long planning really took on our last ten applications, and what slowed the slow ones
A content brief for a small residential architecture practice, written for the homeowner planning an extension or a new house who has been told eight weeks and is about to sign a fee proposal.
- Channel
- Content marketing
- Format
- Articles in the practice's journal, one a fortnight
- Audience
- Homeowners weighing an extension, a renovation or a new house, before they appoint an architect
- Measured by
- Enquiries that mention an article, and pieces sent before a first meeting
Brief outline
6 sections
-
01
One reader, before the fee proposal
Write for the homeowner who wants to be on site by a certain month and has not yet worked back from it. Architecture for London hears the question "During the outline design stage in a project"; your article should reach them before that stage. Every piece ends with one ask: a first meeting about their site.
-
02
Your own record, council by council
List your recent householder and minor applications: council, date validated, date decided, any extension of time. Publish the elapsed weeks for each, and say how many applications the figures cover. Ten is enough if you say it is ten.
-
03
What slowed the slow ones
Take the two or three that ran longest and say why, without naming the client: validation queries, a conservation officer, neighbour objections, a committee date. Then say what you now do before submitting because of it.
-
04
The whole wait, from appointment
Count the months from the day a client appoints you, not from submission, as Architecture for London does. Survey, design, pre-application advice and drawings come first, and they are the part a homeowner can actually plan around.
-
05
Send it before the first meeting
The article goes in the reply to every new enquiry that names a start date, in the practice newsletter, and to the local builders and estate agents who refer you. Give whoever takes enquiries a two line note on when to send it.
-
06
Owner, day and checkpoints
One person keeps the application log and the fortnightly day, with five pieces written before the first goes live. A director gives half an hour a fortnight to be interviewed. Refresh the figures every January, and check at week four, week twelve and month six whether to carry on, change the topics or stop.
What it read
15 sources
Business context
How small practices win work (RIBA's source-of-work figures, homeowners, referrals and repeat clients), the trade's year, the rules on how architects promote themselves, and the words practices use.
Architecture practice industry profile
Research
5 articles UK practices wrote for homeowners about the planning wait and whether to hire an architect, plus 19 practices whose marketing is documented in trade press, archives and their own pages.
Playbook know-how
Mole Marketer's content marketing skill, on how an editorial programme is chosen from buyers' real questions, written, shared and measured.
Content marketing skill
On this page
- The short version
- What architecture practices actually publish
- Who's doing it well
- What the best ones do differently
- Where practice content goes wrong
- A year of articles, on the practice's own calendar
- What to measure
- Pick your first article
- Make it a process, not one article
- Frequently asked questions
- Where to start
The short version
- Write for the homeowner with a start date in mind who has not yet counted the planning wait.
- Publish your own decision times, council by council, and say how many applications they cover.
- Explain the two or three slow ones and what you now do differently before submitting.
- Count the whole wait from appointment, because that is the part a client can plan.
- The brief above is free to copy. Pull your last ten applications from the council portals and hand it to whoever writes for you.
Most practice websites carry a portfolio, a page about the team and a news feed of awards. The homeowner reading them is usually doing sums about time: when they can be on site, whether the summer is realistic, how long before the builder can be booked. Urbanist Architecture, a small London practice, opens its answer with the line every client has heard: "Ask how long planning permission takes and the standard answer is eight weeks." Content marketing for an architect is writing the answer you give once a client has signed, before they sign.
What architecture practices actually publish
Four articles UK practices wrote for homeowners still deciding, three on the planning wait and one on whether to appoint an architect at all. Each card links to the piece, with the line that carried it.
Urbanist Architecture · London, UK
Planning permission timelines in London: Every borough ranked
“Ask how long planning permission takes and the standard answer is eight weeks.”
The practice's planning lead ranks every London borough by the weeks from receipt to decision, from 2025's householder decisions.
Architecture for London · London, UK
How long does planning permission take?
“During the outline design stage in a project, our clients often ask us: how long does planning permission take?”
First published in 2020 and updated in January 2026. Counts from the architect's appointment, with its own Muswell Hill extension as the picture.
PLOT Architecture + Design · Battersea, London, UK
How long does planning permission take?
“Based on our experience, the time taken for the council to decide can exceed the statutory determination period.”
A short journal piece that points readers to the practice's page of permissions won as its evidence.
RISE Design Studio · London, UK
Do I Need an Architect?
“It's a question we hear a lot, usually from people who are already thinking seriously about a project and trying to work out whether the fee is worth it.”
Admits that very simple work can go ahead without an architect, then says where that stops.
Who's doing it well
Who's doing it well
“During the course of that research, they frequently discover my site.”
- Writing for homeowners since January
- 2010
- Podcast episodes, August to November 2026
- Fortnightly
- Episodes by 1 November 2026
- 213
Bob Borson, a residential architect in Texas, has written for homeowners on Life of an Architect since January 2010. In an article for Texas Architect, reprinted on the blog, he described the aim plainly: "I present ideas and design solutions to common problems most homeowners are likely to face." His account of what it does is just as plain: "Homeowners are able to ask questions in a non-committal manner, which for them makes reaching out to our firm much easier and direct." There are no figures, only his description. The site today still publishes every fortnight, now as a podcast that had reached episode 213 by 1 November 2026. Sixteen years of the same reader is what to copy.
What the best ones do differently
They use their own numbers. Urbanist ranked every London borough from 21,331 householder decisions in 2025, written up by the chartered planner who leads its planning team, and checked the result against what it had seen: "Those figures match our first-hand experience of how long Ealing applications can take to reach a decision." A small practice will not have 21,000 decisions. It has ten of its own, and ten real ones beat a national average.
They count from the day a client appoints them. Architecture for London puts the residential wait at "around 5 months, including design time", which is the figure a homeowner needs to plan a build. It first published the piece in 2020 and updated it in January 2026, so the answer stays current.
They admit when they are not needed. RISE Design Studio answers its own question with "No, you don't always legally need an architect. For very simple work, some people manage without one." AR Design Studio in Winchester says much the same: "Some homeowners manage with just a builder and structural engineer". A practice that says so is easier to trust on the larger jobs.
Where practice content goes wrong
The award post. A shortlist and a set of photographs tell other architects something. A homeowner deciding whether to call learns nothing they can plan with. Keep it for the news page and write the journal for the client.
Repeating the statutory answer. Eight weeks is what any search returns. PLOT goes one step further, "Based on our experience, the time taken for the council to decide can exceed the statutory determination period", and points readers to its own permissions. The next step is to publish how much longer, and where.
Writing only when the office is quiet. The industry profile found the same stall in practice newsletters: Mark R. LePage wrote that "every few months I half-heartedly scrambled to send something out" (EntreArchitect). A journal that waits for a gap between projects goes quiet in the months it was meant to fill.
A year of articles, on the practice's own calendar
There is no harvest or spring market for architecture, so the run follows the practice's decisions and the trade's dates. Architecture for London updated its planning piece on 7 January 2026, Open House took homeowners round other people's buildings from 12 to 20 September 2026, and RIBA House of the Year was announced on Grand Designs on 10 December 2025. Write each piece a month before the date it serves.
spring
May
One project told as a decision
Regional awards season; RIBA London's 2026 celebration was on 14 May
summer
Jun
A view the practice holds
London Festival of Architecture runs through June, and the trade is talking
Aug
Your own planning numbers
Urbanist published its borough ranking on 11 August 2026
autumn
Sep
Do you need an architect at all
Open House sends homeowners round other people's houses, 12 to 20 September in 2026
winter
Jan
Refresh the planning piece
Last year's decisions are in; Architecture for London updated its planning article on 7 January 2026
Dec
Write the January backlog
House of the Year goes out on Grand Designs; it was announced on 10 December 2025
Architecture has no buying season. Pace the run on the practice's own decisions and the trade's dates, and write each piece a month before the moment it serves.
What to measure
Most of a small practice's work arrives by word of mouth and repeat clients, so an article's job is often to convince someone who was already told about you. Ask every enquiry what they read, keep the counts below, and judge the run at month six.
| What to watch | Figure | How to read it |
|---|---|---|
| Enquiries that mention an article | Your first six months | The conversion that pays; ask every enquiry what they read first |
| Articles sent before a first meeting | Every week | The early sign a piece answers a question homeowners really ask |
| New projects from marketing and search | 12 to 15% (RIBA, 2024) | Small practices' share in 2024; word of mouth was 31 to 35% |
| Pieces published on the day | One a fortnight | Miss two in a row and the programme has stalled |
| Planning figures refreshed | Every January | A timeline piece dates as soon as the next decisions come in |
Source: RIBA Business Benchmarking 2024, practices of one to under five staff, table 5-6
Pick your first article
If you can only write one this quarter, start with the question that costs your first meetings the most time.
- Start with your planning record if
- homeowners arrive with a start date that ignores the planning wait. Your own decision times, council by council, are the piece only you can write.
- Start with the whole wait from appointment if
- you have too few applications to publish figures yet. Walk through the months from first meeting to decision on one recent extension.
- Start with whether they need an architect if
- enquiries stall at the fee proposal. Say honestly which small jobs can go ahead without you, and the rest of what you write gets believed.
Make it a process, not one article
Pulling ten decision dates off the council portals is an afternoon. A programme is the rest of the year: keeping the application log current as decisions land, getting half an hour a fortnight from a director who is on site, asking a client whether their extension can be the worked example, and refreshing the numbers every January before they date.
That upkeep is where Mole Marketer helps a practice. From the questions your team logs, your marketing manager proposes the next piece, briefs it with a director's interview answers already inside, puts a named owner and a date against it on the marketing calendar, and shows which article sent each visitor who enquired. It briefs 53 marketing channels, content marketing among them, so your newsletter, your planning pages and your Open House weekend run on the same process.
Frequently asked questions
What should an architect write about?
The questions homeowners ask before they appoint you, not the projects you are proudest of. Architecture for London wrote its planning article because clients ask about the wait during outline design, and RISE Design Studio wrote its piece on whether to hire an architect because "It's a question we hear a lot". How long, how much, in what order and whether you are needed at all are all answered out loud in first meetings already.
Can we publish how long our planning applications took?
Yes, if the figures are accurate and you say what they cover. ARB's Architects Code asks architects to "Promote their services responsibly and accurately", so give the number of applications and the dates they span, and keep clients unnamed unless they agree. This is what the code says, not legal advice.
Isn't it eight weeks anyway?
That is the statutory period for a householder application, and it starts once the council has validated it. Urbanist Architecture found an average of 9.1 weeks across 21,331 London householder decisions in 2025, from 6.9 weeks in Redbridge to roughly 13 to 15 weeks in Hammersmith and Fulham. Your own councils' figures are the ones your readers need.
Do articles bring in work for a practice that lives on referrals?
They help referrals land. In RIBA's 2024 benchmarking small practices traced 31 to 35% of new projects to word of mouth and 12 to 15% to marketing and search. Someone told about you will usually read your site before calling, and an article on the planning wait gives them a reason to.
Can Mole Marketer write the articles for us?
It briefs them and can draft a first version from the brief for your team to finish. Your team supplies the application record and the judgement, approves every piece and publishes it on your own site.
Where to start
Copy the brief above into your own notes. Before the next practice meeting, list your last ten applications with their validation and decision dates; the spread between the fastest and the slowest is article one. Book the "whole wait from appointment" piece for a fortnight later, so the run has a second date before the first goes live.